CASTLE EURO manuels

Manuels d'utilisation et guides de l'utilisateur pour Systèmes de contrôle d'accès de sécurité CASTLE EURO.
Nous fournissons des manuels en pdf 5 CASTLE EURO à télécharger gratuitement par type de document : Spécifications, Manuel d'utilisateur, Manuel d'installation


Table des matières

ENGINEERING

1

Page (ii) September 2002

3

Issue 3·1 Page (iii)

4

Page (iv) September 2002

5

Issue 3·1 Page (v)

6

Page (vi) September 2002

7

INTRODUCTION

8

COMPLIANCE STATEMENT

9

DD243:2002

9

EXPANSION OF Euro-44+

9

WARRANTY

9

Page 1 - 4 Chapter 1

11

SYSTEM COMPONENTS

12

SYSTEM ARCHITECTURE

14

B: Euro-12

15

C: Euro-22

16

D: Euro-28

17

E: Euro-44+ EoL Mode

18

F: Euro-44+ iD Mode

19

TMZ UNITS

21

OUTPUT MODULES

21

ACCESS CONTROL EQUIPMENT

21

GUARD TOUR SYSTEMS

21

INTELLIGENT POWER SUPPLIES

21

SPECIFICATIONS

22

C: OUTPUT CAPABILITIES

23

D: HOUSING DIMENSIONS

23

E: ELECTRICAL SPECIFICATIONS

24

F: WIRING SPECIFICATIONS

25

A: General Principles:

25

C: End of Line Zone Wiring

25

D: iD Wiring

25

G: LOCATION OF ZONES

26

Page 4 - 6 Chapter 4

27

THE USER INTERFACE

28

Page 5 - 2 Chapter 5

29

(i) LEVEL SETTING

30

(ii) AREA SETTING

30

(iii) ALL SYSTEMS

30

Page 5 - 4 Chapter 5

31

E: SILENT SETTING

32

F: EXIT MODES

32

G: KEYSWITCH OPERATION

33

H: UNSET ONLY INPUT

33

I: FAIL TO SET

34

J: SETTING WITH FAULTS

34

K: SYSTEM CODES / TAGS

34

L: VALID CODE SILENCES

35

M: DEVICE FAILURE

35

N: OTHER FAULT

35

INDICATIONS

35

INDICATIONS and TONES

36

Page 6 - 2 Chapter 6

37

(i) Customise Text Strings

38

(ii) Display characteristics

38

Page 6 - 4 Chapter 6

39

PARTITIONING THE SYSTEM

40

B: ZONES ‘ANY or ‘ALL’

41

C: Keyswitch Control

41

D: Area Sounders

41

EMERGENCY ALARMS

42

B: FIRE ALARMS

43

C: GAS ALARMS

43

D: MIMIC DISPLAYS

43

E: CALL SYSTEMS

43

REMOTE SIGNALLING

44

Page 9 - 2 Chapter 9

45

Misoperation (Abort)

46

Signalling

46

Engineer Reset

46

Digi Reply Signal

46

E: SEQUENTIAL

47

CONFIRMATION SIGNALLING

47

OPERATION:

48

COMPLIANCE WITH SPECIFIC

49

REQUIREMENTS

49

Chapter 9 Page 9 - 7

50

Page 9 - 8 Chapter 9

51

Chapter 9 Page 9 - 9

52

Patent applied for

52

Page 9 - 10 Chapter 9

53

INSTALLATION

54

B: MOUNTING THE

55

EQUIPMENT

55

C: TAMPER SWITCHES

55

No. 6 round-head

55

DANGEROUS

56

AND enabled in the

57

H: THE PRINTED CIRCUIT

58

BOARD LAYOUTS

58

(i) THE Euro-10 END STATION

58

(ii) The Euro-12 END STATION

59

Slotfor DigiModem

60

Socket for

61

(v) KEYPADS

62

(vi) SET/UNSET TAG READERS

62

(viii) OUTPUT MODULE

64

(ix) INTELLIGENT POWER

65

(x) PLUG-ON RELAY

66

INTERFACE

66

Page 10 - 14 Chapter 10

67

WIRING THE SYSTEM

68

C: WIRING SPECIFICATIONS

69

D: RS.485 COMMUNICATIONS

70

E. END of LINE DETECTION

70

SINGLE RESISTOR WIRING

71

DOUBLE RESISTOR WIRING

72

F: iD Wiring

73

System response cannot

73

Chapter 11 Page 11 - 7

74

Reminders for successful

75

NOTE: When a Zone Expander

75

G: iD COMMISSIONING

76

READINGS

76

Important Notes for

77

H: OUTPUTS WIRING

78

(i) SAB Connections

78

(ii) End Station Outputs

79

(iv) Output Module Outputs

79

Chapter 11 Page 11 - 13

80

(ix) Plug-on Relay Interface

81

Output Identification

81

J: COMMUNICATIONS

82

(i) A Stand-Alone STU /

82

Dual-path signalling

82

(ii) A Plug-on STU / Dual

83

POWERING UP and ADDRESSING

84

COMPONENTS

84

B: PRE-POWER UP

85

C: POWERING UP

85

™ ™ ™ ™ ™ ™ ™[7]

86

D: Keypad

87

Indications Test

87

PROGRAMMING THE BASICS

88

EXIT ENGINEER MENU

89

B: GENERAL

90

PRINCIPLES

90

C: NON VOLATILE

91

D: PROGRAMMING

91

OPTIONS:

91

(iii) MODE SELECTION

92

(iv) INSTALL ZEMs

93

(v) ZONE PROGRAMMING

93

Zone types:

95

SECURITY PATTERNS

97

ZONE ATTRIBUTES

98

PROGRAMMING STEPS

99

(vi) ASSIGNING KEYPADS

100

(vii) CHANGING SYSTEM

102

DISPLAYS

102

Page 13 - 16 Chapter 13

103

(viii) CHANGING TIMERS

104

PROGRAMMING PROCEDURE:

105

(ix) SET DATE and TIME

106

(x) EXIT MODES

106

(xi) PROGRAMMING CODES

108

CODE TYPES and NUMBERS

108

CODE CAPABILITIES

108

PROGRAMMING

109

PROCEDURE:

109

Manual Euro-MERiDIAN

110

Chapter 13 Page 13 - 23

110

Page 13 - 24 Chapter 13

111

(xiii) ALARM RESPONSES

112

The following steps are

113

SETTING systems:

113

(xiv) PROGRAMMING

114

Page 13 - 32 Chapter 13

119

(xv) INTELLIGENT SETTING

120

LEVEL SETTING SYSTEMS

120

AREA SETTING SYSTEMS

120

ALL SYSTEMS

120

Programming Steps

121

(xvi) SITE OPTIONS

121

Repeat for other options to:

123

(xvii) ENGINEER RESET

124

(xviii) PROGRAMMING THE

124

DIGI-MODEM

124

Page 13 - 38 Chapter 13

125

MANAGER TEST FACILITIES

126

KEYPAD INDICATIONS TEST

126

BATTERY TEST

126

BATTERY LOAD TEST

126

ENGINEER SYSTEM SET

127

ENGINEER FORCE SET

127

SOAK TESTING ZONES

128

ENGINEER TEST FACILITIES

128

Battery Test

129

Outputs Tests

129

SYSTEM DIAGNOSTIC

130

FACILITIES

130

Page 14 - 6 Chapter 14

131

Calibrating ZEM iD output

132

Page 14 - 8 Chapter 14

133

SYSTEM LOGS

134

Fault Codes

135

VIEWING LOGS

135

Chapter 15 Page 15 - 3

136

Ward Control and Shunt Zones

138

Operation of the Ward

139

Programming a Ward:

140

2. SHUNTS

141

Associated Outputs:

142

Operation of the Shunt

142

Programming the Shunt

143

Zone and List

143

Programming the

144

Page 16 - 8 Chapter 16

145

Use of Output Modules

146

TERMINAL CONNECTIONS

147

WIRING THE UNIT

148

RS-485 Wiring:

148

Outputs Wiring:

148

PROGRAMMING THE

149

A: FEATURES

150

B: SYSTEM ARCHITECTURE

151

C: INSTALLATION

151

D: The Door Station

152

E: WIRING

153

Chapter 18 Page 18 - 5

154

F: Addressing the

155

G: Programming the

155

Access Control

155

(ii) Programming the

156

H: SYSTEM LOGS

157

J: PROGRAMMING

157

K: Access Control

157

Facility and DD243

157

GUARD TOUR SYSTEMS WITH

158

Euro-MERiDIAN

158

C: Installing and Wiring

159

D: Programming the units

159

E: SYSTEM LOGS

159

Installing the Euro-COM 9600

160

DigiModem

160

Page 20 – 2 Chapter 20

161

9600 to the End Station

162

A: Features

162

B: Safety and Installation

162

C: The Euro-COM 9600 PCB

162

D: Fitting the Euro-COM

162

E: PSTN Wiring

163

F: Programming the Unit

164

G: Initialisation

164

Page 20 – 6 Chapter 20

165

ARC Signalling with the Digi

166

Page 21 - 4 Chapter 21

169

CONTENT TYPES AVAILABLE

171

DOWNLOADING WITH

172

Control from the PC

173

Signalling modes

173

Line Mode

173

PC at Site

173

PLANNING THE CALLS

173

Priority:

174

SMS Text Messages from Euro

176

MERiDIAN

176

Initialisation

177

Page 23 - 4 Chapter 23

179

_ _ _ _ _

179

_ _ _ _ _ _ _ _ _ _ _

179

[ ]

180

Initialisation and Test

181

Procedure

181

Communication Failure:

181

SYSTEM EXPANSION and

182

ENHANCEMENT

182

Cards Available:

183

Page 24 - 4 Chapter 24

185

CCTV or LIGHTING CONTROL WITH

186

EURO-MERiDIAN

186

Outputs:

187

FAULTFINDING Euro-MERiDIAN

188

Appendix A Page A - 3

190

Page A - 4 Appendix A

191

Appendix A Page A - 5

192

Page A - 6 Appendix A

193

Function Summary of change

196

Issue 3·1 – September 2002

196

Page B - 4 Appendix B

197

Meridian Manuel d'utilisateur   CASTLE Meridian User manual, 45 pages Meridian Spécifications   CASTLE Meridian Specifications, 27 pages Meridian Manuel d'utilisateur   User Manual - Castle Care-Tech, 44 pages